Construction
Foundation – 4 Course
Pillar Construction
Plinth – Steel Reinforcement
KEB Deposit – 3 KW
Wood
Main Door Frame & Door – 2nd Teak With S.S. Fittings
Pooja Door Frame & Door – 2nd Teak With S.S. Fittings
Room & Back Door Frame – Sal Wood & Door – Pro Lam Door
With S.S. Fittings
Bathroom Door Frame – Sal Wood & Door – F.R.P. Door With S.S.
Fittings
Window Frame – Sal Wood & Shutters – 2nd Teak with S.S. Fittings
Tiles
2’ X 2’ Vitrified Floor for inside
18” X 12” Wall Tiles for Kitchen , Pooja , Bathroom & Toilet
1’ X 1’ Floor Tiles for Bathroom , Toilet & Portico
Cooling tiles for Roof
Shutter Wood & Hardware Fittings
Main Door – 2nd Teak With S.S. Fittings
Pooja Door – 2nd Teak With S.S. Fittings
Room & Back Door – Pro Lam Door with S.S. Fittings
Bathroom Doors – F.R.P. Door with S.S. Fittings
Window Shutters – 2nd Teak with S.S. Fittings
Taps & Sanitary
Attach Bathroom – Mixing Tap , Shower , Wash Basin with pedestal
Wall Mounted Commode With Push Cock & necessary fittings
General Bathroom – Mixing Tap , Shower , Wash Basin with
pedestal , Indian closet With necessary fittings
Kitchen – S.S. Sink , 2 Taps
Dining – Wash Basin with Pedestal
Water Tank 750 Litre – 3 Layer
Solar – 100 Litre
Motor – ½ H.P. Submersible
Electrical
Wire – Anchor
Switches – Leon
U.P.S. 800 VA Inverter , 100 AH Battery – 1 No & trolley
Paint – Surfa Coat Paint for inside outside building
Polish – Main & Pooja frame & Shutters