-->--> Foundation Earthquake resistant R.C.C Framed structure with column and beams Super Structure All types of columns ,beams , lintel , R.C.C slabs and brick masonry with good quality lights bricks masonary with good quality lights bricks in structural frame with M-20 mm of cement mortar. Wall 10m external and 5m internal walls of first class diamond bricks. Plastering Internal : double coat cement plaster with excellent finish. External : Double coat sand faced cement plastering with sand stone/state stone clading at designed areas. Flooring Premium quality of vitrified tiles flooring in bed rooms,drawing,dining,balcony andskid ceramic tiles flooring in toilets. Kitchen Granite cooking platform with ceramic tiles and stainless steel sink. Door All door frames will be well seasoned sal wood of suitable section and are of factory made flush door shutters Window Window will be powder coated aluminium frames with protective grills having sliding or panelled glazed shutters Painting Internal : Smooth finishing good quality putty over a coat of primer finished with two coats of paint ( Asian paints/Nerolac/Berger) External : Outside paint with exerior emulsion ( Weather Coat). Electrical All electrical wiring with premium brand free resistant insulated copper wire/in concealed conduit to wall,ceiling etc.adequate no. of lights points. Water Supply Each Appartment block is provided 24X7 hours water supply through independent deep bore well and over head water tank. Lifts automatic passenger lift to standardmake in each apartment block. Parking Area Best quality cement based parking tiles. Security Intercom connectivity to central security from all houses. --> Payment Schedule ( Sai Paradise ) : On Booking 10% On Agreement 10% On Completion of Foundation 25% On Completion of Ground floor 10% On Completion of First Floor Slab 10% On Completion of Second Floor Slab 10% On Completion of Third Floor Slab 10% On Completion of Respective Floor brick work 0.5% On Completion of Flooring 0.5% On Possession 0.5% Terms & Condition : Cancellation during construction Period - 10% of total cost ( Cancellation charge ). Registration will be done only after total amount has been received by the company. Registration charges and expenses will be borne by the buyer in actual. Extras ( To be Borne by Owner ) : Parking. Society and Power Backup for common areas. Any Extra work.